Kitchen Catch-up

Our kitchen is half way complete! The wall is out, the plumbing and electrical are done, the new floor is down and the lighting is up. Also, in the midst of all of that we had the popcorn ceilings scraped throughout the entire house. Next will be to have the cabinets painted (I’m not tackling that myself!),¬†install new countertops, a backsplash, and a new sink and faucet. Here are some pictures that show our progress.

We took down the built-in lighting box, installed 8 can lights and a new pendant over the sink.

kitchen-before

kitchen-after

We painted the walls, trim and doors white, installed a new light fixture over the table, and had 12 x 24 charcoal tiles put down on the floors.

eat-in-before

eat-in-after

The wall is out and patched. Whatever countertop material we choose will also be on the ledge. We also painted the entire living room white, I love how much it brightened everything up!

kitchen-before2

kitchen-after-2

Here is the living room ceiling before. We also replaced the dated eyeball lights above the mantle.

popcorn-before

We moved most of our furniture into the sunroom and garage. We spent the next few days with family and friends while our home was transformed!

popcorn-mid

popcorn-mid3

And finally…

popcorn-after

popcorn-after2

Posted in Projects.